Hello,
I am running an implicit analysis,
Simulation time is defined in control card with termination.
In *DATABASE_ASCII OPTION card I check the outputs I want and I give the 1/100 th of termination time for each output.
Second, in *DATABASE_BINARY_D3PLOT I give DT 1/200 th of the termination time.
However, I get 20 calculation points in the output files, instead of 100 points.
How should I control time step so that I could increase the calculation points in the output ?
1 Reply
January 23, 2021 5:37 pm
Just found the solution,
in *CONTROL_IMPLICIT_AUTO card if you choose the option IAUTO as 1 the step size is automatically controlled by Dyna, however if you choose it as 0, then your DT in *DATABASE is valid.